Six conditions that need to be met in the construction of pu sandwich panel production line

Author: Sinowa/Post Date: 2021-08-02/Keywords: pu sandwich panel production line

Sinowa is familiar with the trends of the thermal insulation industry at home and abroad, and always brings effective first information to the readers. Today, I will bring you six conditions that need to be met for the construction of the polyurethane sandwich panel production line:

First of all, the polyurethane sandwich panel base wall should meet the requirements of the specification, and it has been checked and accepted.

pu sandwich panel production line

The construction of the polyurethane sandwich panel project should be carried out after the base layer is painted with a cement mortar leveling layer and the construction quality is qualified.

Before the construction of the thermal insulation project, the outer door and window openings should pass the acceptance, the size and location of the openings should meet the design requirements and the acceptance should be qualified. The door and window frames or auxiliary frames should be installed and waterproofed. The embedded parts and connectors of fire ladders, downpipes, various entrance pipelines and air conditioners that extend out of the wall should be installed, and the thickness of the polyurethane sandwich panel should be reserved.

pu sandwich panel production line

External wall scaffolding for the installation of insulation boards is required, and the scaffolding should be stable and reliable.

The ambient temperature during construction should not be higher than 35℃, should not be lower than 5℃, and should not be lower than 0℃ within 24h, and the wind should not be higher than level 5. Rainproof measures should be taken during construction in rainy days.

pu sandwich panel production line

The incoming materials of polyurethane sandwich panels should be stored in a dry and cool place, and the storage period and conditions should be in accordance with the requirements of the material supplier’s product description.

The above is the construction requirements for polyurethane sandwich panels brought to you today. Sinowa is engaged in pu sandwich panel line equipment and has unique insights on the process of color steel insulation panels. More customers are welcome to come to consult.

Page Url: http://bjlssy.cn/en/six-conditions-that-need-to-be-met-in-the-construction-of-pu-sandwich-panel-production-line.html

You are here: Home / News / Six conditions that need to be met in the construction of pu sandwich panel production line
Contact Us
Email: sinowa@sinowa.cn
Call: +0086 151 0610 6366
Add: High-tech Industrial Development Zone, Zhenjiang, China
成人无码视频| 国产二区交换配乱婬| 中文字幕无码乱码人妻系列蜜桃| 国产精品久久久久久久久久免费| 天天弄天天模| 国模吧无码一区二区三区| 性猛交ⅹxxx富婆视频| 国产无遮挡又黄又爽又色| 狠狠躁天天躁无码中文字幕| 边啃奶头边躁狠狠躁| 人妻巨大乳hd免费看| 亚洲国产激情一区二区三区| 天堂а在线中文在线新版| 日韩人妻一区二区三区蜜桃视频| 内射女校花一区二区三区| a级毛片内射免费视频| 国产精品久久久久久一区二区三区| 免费人成网站在线观看欧美| 最新亚洲人成网站在线观看| 国产一区二区三区四区五区加勒比| 特黄a级毛片免费视频| 东北老女人高潮大喊舒服死了| 中文字幕无码不卡免费视频| 欧美黑人xxxx高潮猛交| 亚洲熟女乱综合一区二区| 国产精品区一区第一页| 亚洲精品久久久久久动漫| 99在线精品视频观看免费| 亚洲avav天堂av在线网爱情 | 成人区人妻精品一区二区不卡| 无码aⅴ在线观看| 国产又爽又粗又猛的视频 | 超碰人人超碰人人| 日韩不卡手机视频在线观看| 99精品视频在线观看| 97免费人妻无码视频| 精品无码国产一区二区三区51安 | 国产成人久久精品激情| 亚洲 欧美 国产 制服 动漫| 精品免费看国产一区二区| 久久精品国产精品亚洲精品|